Floorguard PU 100 is two-pack polyurethane topcoat with excellent gloss and retention designed for exterior . Use for floor coating have excellent durability and adhesion, excellent chemical resistance and abrasion resistance . As a topcoat over an epoxy system for UV light resistance for factory floor, cagewash areas, chemical processing plants, warehouse, factory, food and beverage plants.
APPLICATION SYSTEM Surface Preparation Floor
For New concrete - The concrete prior to laying plastic sheets to block moisture from underground. Then it should be left for curing concrete to solid and dry for about 3-4 weeks. Then, clean the surface free from dust, dirt, grease and most importantly, the surface is completely dry. (Check moisture content must be less than 10%)
For Old concrete - To remove the old paint film which loosely adhesion to as much as possible by Scraping with a shovel or Grinding machine to enhance adhesion. Then, clean the surface free from grease and oil with suitable solvent. Before primer coating should clean all surfaces free from dust, dirt, grease and most importantly, the surface is completely dry. (Check moisture content must be less than 10%).
For Floor Hardener or Surface glossy finish :
Concrete surface preparation by using dust free captive blasting units, grinding equipment, sand blasting for increase adhesion of coating.
Inspect the concrete for bug holes void, fin and other imperfections. Protrusions shall be ground smooth while voids shall be filled with Floorguard Putty or other suitable filler and polishing of surface with moltoprene disk.
After cleaning, repair surface defects and remove detericrated previous coatings. (Check moisture content must be less than 10%).
Before Recoat by Topcoat
Remover all oil, grease, dirt, oxide and other foreign material by cleaning per SSPC-SP1, Solvent Cleaning before coating.
If over 7 days gives cleaning surface by sand paper no. 320-400 and cleaning surface per SSPC-SP1, Solvent Cleaning before coating.
Surface repaire (cracks, pores, holes) done with Floorguard putty and polishing of surface with moltoprene disk.
Coating System
Concrete protective Coating
Primer Floorguard Primer 50 microns x 1 coat
Topcoat Floorguard PU 100 50 microns x 2 coats
For Floor Hardener or Surface glossy finish
Primer Penetrating Sealer 50 microns x 1 coat
Topcoat Floorguard PU 100 50 microns x 2 coats
Recommendation
The proper relative humidity in the work shall not exceed 85% RH.
The temperature of the substrate should be minimum 10 C and at least 3 ํ C above the dew point of the air , ํ temperature and relative humidity measured in the vicinity of the substrate for prevent moisture and water drop on substrate effective adhesion and drying time.
HANDLING AND STORAGE
Storage condition
The product must be stored in accordance with national regulations. Storage conditions are to keep the containers in a dry, cool, well ventilated space and away from source of heat and ignition.
Shelf life : 24 months at 30-35 ํC
Package
Packaging size
Part A
Part B
1 Gallon Set
1 Gallon
1/4 Gallon
HEALTH AND SAFETY
Please observe the precautionary notices displayed on the container. Use under well ventilated conditions. Do not breathe or inhale mist. Avoid skin contact. Spillage on the skin should immediately be removed with suitable cleanser, soap and water. Eyes should be well flushed with water and medical attention sought immediately.
For detailed information on the health and safety hazards and precautions for use of this product, we refer to the Safety Data Sheet.